INSTALLATION OF FOUR 1,271 KW OF YORK YVAA 1315VJF CHILLERS AT THE INTERNATIONAL AIRPORT OF PORT HARCOURT.
INSTALLATION OF FOUR 1,271 KW OF YORK YVAA 1315VJF CHILLERS AT THE INTERNATIONAL AIRPORT OF KANO
INSTALLATION OF SIX 1,436 KW YORK YVAA 1443VLG CHILLERS AND THE INSTALLATION OF FOUR 1,271 KW YORK YVAA 1315VJF CHILLERS
INSTALLATION OF FOUR 994 KW YORK YVAA 0183AB CHILLERS ,TWO YCUL 0045 CU , TWENTY ONE YORK YMS AHU, FOUR KSB PUMPS, VARIOUS AIRE DAMPERS, GRILLES, DIFFUSERS, ELECTROSTATIC AIR CLEANER, VENTILATION FANS, 3-WAY MIXING VALVES , ACTUATORS AND THERMOSTATS
INSTALLATION OF ERV, ENERGY RECOVERY UNIT AT THE CENTRAL BANK OF NIGERIA, OWERRI.
INSTALLATION OF THREE 610 KW YORK YVAA 0183ABF CHILLERS , ONE YCUA 0298 CHILLER UNIT , NINE YORK YMS AHU, FOUR YORK CLOSE CONTROL UNITS, THREE KSB PUMPS, VARIOUS AIRE DAMPERS, GRILLES, DIFFUSERS, ELECTROSTATIC AIR CLEANER, VENTILATION FANS, 3 WAY MIXING VALVES , ACTUATORS AND THERMOSTATS
INSTALLATION OF SIX 1,436 KW YORK YVAA 1443VLG CHILLERS AND THE INSTALLATION OF FOUR 1,271 KW YORK YVAA 1315VJF CHILLERS
INSTALLATION OF THREE 617 KW YORK YCIV0 CHILLERS , TEN YORK YMS AHU, FIVE AIRDALE CLOSE CONTROL UNITS , THREE KSB PUMPS, VARIOUS FIRE DAMPERS, GRILLES, DIFFUSERS, VENTILATION FANS, VARIOUS CONTROLS AND THERMOSTATS